See also:
UDM EPR Bullets
- Plans, organizes, prioritizes, coordinates, administers and controls the deployment of unit personnel and cargo
- Develops/reviews mobility plans for deployment of cargo/personnel to meet Unit Type Code (UTC) taskings
- Maintains, reviews and updates personnel deployment records and tracks availability status of 373 personnel
- Compiles monthly Status of Resources and Training Systems (SORTS) data for distribution to wing units
- Flawlessly processed 35 ECS taskings & 10 reclamas; 52 personnel deployed--zero errors or theater shortfalls
- Scrutinized 120+ pers mobility records; ID'd & abolished 200+ discrepancies--fortified FW's benchmark prgm
- Identified 11 FW ART/SORTS shortfalls; improved reports to HQ ACC & Wg ldrs--sys inputs 100% accurate
- Enabled AEF trng; scheduled 150+ classes for AEF cycle--159 mbrs fully qualified 2 weeks prior to departure
- Attended HHQ level SORTS class; vital to XX FW's cmbt readiness--assured ACC reports met 100% accuracy
- Deployed three personnel for short-notice AEF taskings; spun up in 3 days--zero outprocessing discrepancies
- Coord'd annual dental exams; 331 Amn informed of readiness rqmt--ensured 100% MXS mobility effectiveness
- Efficient leader; reengineered isolated prsnl recovery info process--solidified Sq compliance to 100% current
- Organized/engaged 136 tons cargo/16 pax processed; spt'd four OREs--fortified Wg 2.8K sorties/5.5K fly hrs
- Strong UDM--processed 50 pers to 10 worldwide locations--prepared/equipped in support of critical ops
- Guided construction of comprehensive emergency response plan for 1XXXX; stellar plan ready when needed
- Sterling leader; proven ability to get the job done--handpicked to ready and guide this squadron through an ORI
-- Orchestrated amazing mobility machine; processed 37 maintainers/82 cargo increments--zero discrepancies
-- Dissected 55 mobility folders; corrected 61 discrepancies; ORI deployers processed with no folder errors
-- Pre-screened medical readiness for every ORI processor; identified and coordinated fix of 28 discrepancies
- Force multiplier--guided move of 60 AGE pieces between classified sites; superb fwd deployment of MH-53
- Streamlined government passport process; ensured availability of personnel for short-notice classified taskings
- Developed mobility equipment/personnel tracking prgm--ensured 100% accountability of deployed personnel
- Tackled individual mobility readiness (IMR); constructed database--increased sq IMR rate from 72% to 93%
- Guided 132 personnel deployments; tracked 1K CBTs/produced $132K in equipment--zero AOR discrepancies
- Mobilized 411 personnel/129 short tons during period--integral to success of four AEFs/six ONEs/15 TDYs
- Tracked 60 UTCs/373 mobility positions; provided CC up-to-date readiness status--enabled GWOT support
- Coordinated 3 unsched aerovac flights--ensured OIF/OEF wounded warriors recieve timely critical care
- Readied/deployed 42 pers; delivered 6,350 days spting OEF/OND/HOA ops--reinforced C2 for 287 cbt msns